Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New bridge completed in 1964 consists of fixed arch made of four ribs each having span of 305 m; at each bank there are four approach spans each 30 m; each rib is hollow rectangular box girder 6 m wide composed of prefabricated units mounted progressively and symmetrically from abutment to crown; ribs were built consecutively and falsework was reused four times; Freyssinet flat jacks method was used in construction.
New bridge completed in 1964 consists of fixed arch made of four ribs each having span of 305 m; at each bank there are four approach spans each 30 m; each rib is hollow rectangular box girder 6 m wide composed of prefabricated units mounted progressively and symmetrically from abutment to crown; ribs were built consecutively and falsework was reused four times; Freyssinet flat jacks method was used in construction.
Gladesville bridge in Sydney, Australia
Le ponte de gladesville a Sydney
Jensen, P. (Autor:in)
1966
24 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Creep and shrinkage tests for Gladesville bridge
Engineering Index Backfile | 1964
|Pyrmont bridge, Sydney, Australia
Engineering Index Backfile | 1903
|The Sydney harbor bridge, Australia
Engineering Index Backfile | 1904
The Glebe Island Bridge, Sydney, Australia
British Library Conference Proceedings | 1995
|Structures in Australia - Woronora River Bridge, Sydney
Online Contents | 2002
|