Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Expending $5,000,000 to provide adequate water supply for city of Dallas, Texas
Particulars of Garza reservoir dam to impound 63,000,000,000 gallons; construction involves hydraulic fill dam, puddle core trenches, steel sheet piling, concrete culverts and spillways.
Expending $5,000,000 to provide adequate water supply for city of Dallas, Texas
Particulars of Garza reservoir dam to impound 63,000,000,000 gallons; construction involves hydraulic fill dam, puddle core trenches, steel sheet piling, concrete culverts and spillways.
Expending $5,000,000 to provide adequate water supply for city of Dallas, Texas
Mfrs. Rec
Thompson, R.A. (Autor:in)
1925
2 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Louisville's $5,000,000 sewers
Engineering Index Backfile | 1913
|$5,000,000 James river bridge project
Engineering Index Backfile | 1928
|DALLAS CITY PERFORMANCE HALL, TEXAS SOM
British Library Online Contents | 2014
|Edge of a City, Dallas-Fort Worth, Texas
Online Contents | 1994
|