Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Details of Rank, Lakewood, and cable crane systems of concrete construction; pouring, conveying, and distributing equipment used in construction of barrage dam for Waggital power plant; concrete work of Waggital power house; etc. (See also - no. 4 Feb. 20 1925 p 43-48)
Details of Rank, Lakewood, and cable crane systems of concrete construction; pouring, conveying, and distributing equipment used in construction of barrage dam for Waggital power plant; concrete work of Waggital power house; etc. (See also - no. 4 Feb. 20 1925 p 43-48)
Cast and poured concrete in recent power plant construction
Guss- und Schuttbeton bei neueren Kraftwerksbauten
Randzio (Autor:in)
Beton und Eisen ; 24
1925
4 pages
21 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Integrally-poured concrete channel construction method
Europäisches Patentamt | 2021
|Drainage pipeline concrete poured inspection well construction method
Europäisches Patentamt | 2016
|Engineering Index Backfile | 1928
|Distributing systems for poured concrete
Engineering Index Backfile | 1925
|