Integrally-poured concrete channel construction method
The invention discloses an integrally-poured concrete channel construction method. The integrally-poured concrete channel construction method comprises the following steps that 1, formworks are manufactured, wherein the formworks comprise the outer formwork and the inner formwork; 2, the formworks are installed, wherein after channel foundation trench excavation and steel bar manufacturing and installing are completed, the formworks are installed, the outer formwork is arranged on the inner side of a channel excavation side boundary, the inner formwork is arranged on the inner side of the outer formwork, the channel excavation side boundary and the outer formwork are supported through battens, mortar blocks are arranged between the outer formwork and the inner formwork to form a first cavity, and the multiple adjacent inner formworks are supported through battens; 3, concrete pouring is conducted, wherein after formwork manufacturing and installing are completed, concrete pouring is conducted, concrete is put into a warehouse through the first cavity between the inner formwork and the outer formwork, and a channel foundation trench bottom plate is paved with the concrete through a suspension structure between the inner formwork and the channel excavation side boundary; and 4, plastering construction is conducted. The integrally-poured concrete channel construction method has the beneficial effects that the concrete pouring quality of the connecting position of the channel bottom plate and a side wall can be effectively improved, and the seepage-proofing performance of a channel is improved.
本发明公开了一种整体浇筑的渠道混凝土施工方法。它包括如下步骤,步骤一:模板制作;模板包括外模板和内模板;步骤二:模板安装;渠道基槽开挖和钢筋制安完成后,进行模板安装;在渠道开挖边线内侧设置外模板,在外模板内侧设置内模板;渠道开挖边线与外模板之间通过木方支撑;外摸板与内模板之间设置砂浆块,形成第一空腔;相邻的多块内模板之间通过木方支撑;步骤三:混凝土浇筑;完成模板制安后,进行混凝土浇筑;混凝土通过内模板和外模板之间的第一空腔入仓;混凝土通过内模板与渠道开挖边线之间的悬空结构铺满渠道基槽底板;步骤四:抹面施工。本发明具有能有效地提高渠道底板和边墙连接部位混凝土浇筑质量,提高渠道的防渗性能的优点。
Integrally-poured concrete channel construction method
The invention discloses an integrally-poured concrete channel construction method. The integrally-poured concrete channel construction method comprises the following steps that 1, formworks are manufactured, wherein the formworks comprise the outer formwork and the inner formwork; 2, the formworks are installed, wherein after channel foundation trench excavation and steel bar manufacturing and installing are completed, the formworks are installed, the outer formwork is arranged on the inner side of a channel excavation side boundary, the inner formwork is arranged on the inner side of the outer formwork, the channel excavation side boundary and the outer formwork are supported through battens, mortar blocks are arranged between the outer formwork and the inner formwork to form a first cavity, and the multiple adjacent inner formworks are supported through battens; 3, concrete pouring is conducted, wherein after formwork manufacturing and installing are completed, concrete pouring is conducted, concrete is put into a warehouse through the first cavity between the inner formwork and the outer formwork, and a channel foundation trench bottom plate is paved with the concrete through a suspension structure between the inner formwork and the channel excavation side boundary; and 4, plastering construction is conducted. The integrally-poured concrete channel construction method has the beneficial effects that the concrete pouring quality of the connecting position of the channel bottom plate and a side wall can be effectively improved, and the seepage-proofing performance of a channel is improved.
本发明公开了一种整体浇筑的渠道混凝土施工方法。它包括如下步骤,步骤一:模板制作;模板包括外模板和内模板;步骤二:模板安装;渠道基槽开挖和钢筋制安完成后,进行模板安装;在渠道开挖边线内侧设置外模板,在外模板内侧设置内模板;渠道开挖边线与外模板之间通过木方支撑;外摸板与内模板之间设置砂浆块,形成第一空腔;相邻的多块内模板之间通过木方支撑;步骤三:混凝土浇筑;完成模板制安后,进行混凝土浇筑;混凝土通过内模板和外模板之间的第一空腔入仓;混凝土通过内模板与渠道开挖边线之间的悬空结构铺满渠道基槽底板;步骤四:抹面施工。本发明具有能有效地提高渠道底板和边墙连接部位混凝土浇筑质量,提高渠道的防渗性能的优点。
Integrally-poured concrete channel construction method
一种整体浇筑的混凝土渠道施工方法
HUANG FAN (Autor:in) / ZHOU ZHIGANG (Autor:in) / DING YE (Autor:in) / HU KUNSHENG (Autor:in) / WANG HONGQING (Autor:in) / DU XIANGHUI (Autor:in) / ZHENG XIN (Autor:in) / HUANG YANPU (Autor:in) / XIA JUN (Autor:in) / WANG CHANGYU (Autor:in)
30.11.2021
Patent
Elektronische Ressource
Chinesisch
Integrally poured house building construction process
Europäisches Patentamt | 2021
|Integrally-poured building construction structure and method
Europäisches Patentamt | 2021
|Integrally poured building house construction system and construction method
Europäisches Patentamt | 2023
|