Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile column method
Method of construction of multipile basement building within crowded city limits used in Japan ensures no interference with heavy city traffic and shortens construction time; bentonite liquid is utilized to reinforce soft soil; steel pipe is inserted in drillhole to reach base pier and filled with concrete; each basement floor slab acts as horizontal strut; example of main structure of N.H.K. Broadcasting Hall in Tokyo presented.
Pile column method
Method of construction of multipile basement building within crowded city limits used in Japan ensures no interference with heavy city traffic and shortens construction time; bentonite liquid is utilized to reinforce soft soil; steel pipe is inserted in drillhole to reach base pier and filled with concrete; each basement floor slab acts as horizontal strut; example of main structure of N.H.K. Broadcasting Hall in Tokyo presented.
Pile column method
Australasian Engr
1963
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Column Pile Construction Method Using Removeable Auxiliary Pile
Europäisches Patentamt | 2019
|PILE COLUMN JOINT STRUCTURE, AND CONSTRUCTION METHOD OF PILE COLUMN JOINT STRUCTURE
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|