Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wet silt complicates dam job
Features of dewatering and excavating operation used to remove 3000 ft long silt layer that runs 30 ft deep in construction of 86 ft high and 4.6 mi long Cheney Dam 25 mi west of Wichita, Kan; wellpoint system to remove water from material with average drawdown of 22 ft.
Wet silt complicates dam job
Features of dewatering and excavating operation used to remove 3000 ft long silt layer that runs 30 ft deep in construction of 86 ft high and 4.6 mi long Cheney Dam 25 mi west of Wichita, Kan; wellpoint system to remove water from material with average drawdown of 22 ft.
Wet silt complicates dam job
Construction Methods Equipment
1963
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|A TV Complicates the Mantelpiece
British Library Online Contents | 2007
|Small site complicates big sewage plant
Engineering Index Backfile | 1965
Unmapped eroded limestone complicates corewall job
Engineering Index Backfile | 1935
|Scant headroom complicates grade-separation problem
Engineering Index Backfile | 1933
|