A platform for research: civil engineering, architecture and urbanism
Wet silt complicates dam job
Features of dewatering and excavating operation used to remove 3000 ft long silt layer that runs 30 ft deep in construction of 86 ft high and 4.6 mi long Cheney Dam 25 mi west of Wichita, Kan; wellpoint system to remove water from material with average drawdown of 22 ft.
Wet silt complicates dam job
Features of dewatering and excavating operation used to remove 3000 ft long silt layer that runs 30 ft deep in construction of 86 ft high and 4.6 mi long Cheney Dam 25 mi west of Wichita, Kan; wellpoint system to remove water from material with average drawdown of 22 ft.
Wet silt complicates dam job
Construction Methods Equipment
1963
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|A TV Complicates the Mantelpiece
British Library Online Contents | 2007
|Toxic Gas Complicates Train Crash Rescue
British Library Online Contents | 1996
Hurricane Complicates Platform Salvage In Gulf
Online Contents | 2004
Small site complicates big sewage plant
Engineering Index Backfile | 1965