Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experiences of special method used in construction of 850 m long earth dam with bottom soil consisting of sand gravel.
Experiences of special method used in construction of 850 m long earth dam with bottom soil consisting of sand gravel.
Unilateral hydraulic fill of dams
Odnostoronnii namyv plotiny
Smorkalov, A.F. (Autor:in)
1963
4 pages
Aufsatz (Zeitschrift)
Russisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1920
|ASCE | 2021
|Engineering Index Backfile | 1920
Engineering Index Backfile | 1934
|