A platform for research: civil engineering, architecture and urbanism
Experiences of special method used in construction of 850 m long earth dam with bottom soil consisting of sand gravel.
Experiences of special method used in construction of 850 m long earth dam with bottom soil consisting of sand gravel.
Unilateral hydraulic fill of dams
Odnostoronnii namyv plotiny
Smorkalov, A.F. (author)
1963
4 pages
Article (Journal)
Russian
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1920
|ASCE | 2021
|Engineering Index Backfile | 1920
Engineering Index Backfile | 1934
|