Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Computers provide shortcut in earthwork estimates for dam design
Single table of basic volume parameters can be prepared with aid of computer for rapid calculation of earthwork quantities in dam design, saving time and permitting more thorough investigation of alternative designs and locations; generalized embankment table is applicable whenever embankment cross-section can be assumed to have horizontal base at all points along centerline of dam and from it yardages, volumes of riprap and gravel for slope protection can be determined.
Computers provide shortcut in earthwork estimates for dam design
Single table of basic volume parameters can be prepared with aid of computer for rapid calculation of earthwork quantities in dam design, saving time and permitting more thorough investigation of alternative designs and locations; generalized embankment table is applicable whenever embankment cross-section can be assumed to have horizontal base at all points along centerline of dam and from it yardages, volumes of riprap and gravel for slope protection can be determined.
Computers provide shortcut in earthwork estimates for dam design
Civ Eng (NY)
Gooch, R.S. (Autor:in)
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Earthwork computations on electronic computers
Engineering Index Backfile | 1961
|Construction method of sunken construction shortcut for ultrahigh slope earthwork construction
Europäisches Patentamt | 2024
|