Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quick repair of concrete slabs at Orly airport runway using alumina cement
750 sq m of runway were removed and replaced with new quick-setting 30 cm thick 10-12 m long concrete slabs in 4 days with 9 hr working periods each during which ambient temperature varied from -1 C to +6 C; work organization and equipment described, concrete formulations and test results given.
Quick repair of concrete slabs at Orly airport runway using alumina cement
750 sq m of runway were removed and replaced with new quick-setting 30 cm thick 10-12 m long concrete slabs in 4 days with 9 hr working periods each during which ambient temperature varied from -1 C to +6 C; work organization and equipment described, concrete formulations and test results given.
Quick repair of concrete slabs at Orly airport runway using alumina cement
Refection rapide de dalles de beton sur une piste de l'aeroport d'Orly avec emploi de ciment alumineux
Goudeneche, R. (Autor:in) / Lorin, R. (Autor:in)
Construction ; 18
1963
13 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of new East-West runway at Orly airport
Engineering Index Backfile | 1965
|TERRASSEMENTS - TRAVAUX ROUTIERS - Paris-Orly Airport. Renovation of runway 4.
Online Contents | 2007
|Engineering Index Backfile | 1960
|Airport terminal building at Orly, France
Engineering Index Backfile | 1955
|Online Contents | 2003
|