Account of new station being built on Kemi river in North Finland; earth dam 170 m long and 18 m high will have impervious morraine core; 5.5 km long tailrace tunnel ending in tailrace channel is of 17.5 m diam; underground power plant includes two vertical shaft Kaplan units with 60,000 kW load capacity each; tunneling equipment, blasting, and explosives used are described.
Account of new station being built on Kemi river in North Finland; earth dam 170 m long and 18 m high will have impervious morraine core; 5.5 km long tailrace tunnel ending in tailrace channel is of 17.5 m diam; underground power plant includes two vertical shaft Kaplan units with 60,000 kW load capacity each; tunneling equipment, blasting, and explosives used are described.
Pirttikoski power project
Water Power
Sistonen, H. (Autor:in)
Water Power ; 11
1959
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
|British Library Online Contents
|Engineering Index Backfile | 1956
|Engineering Index Backfile | 1950
|Ontario's biggest power project
Engineering Index Backfile | 1951