Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Arch dam constructed with powerhouse sited immediately downstream; top of dam is at elevation 634, with lowest foundation at elevation 350; water is fed to five turbines in powerhouse by five 16 ft diam penstocks; powerhouse contains five machines operating under net head of 200 ft total rated capacity of 180,000 kW.
Arch dam constructed with powerhouse sited immediately downstream; top of dam is at elevation 634, with lowest foundation at elevation 350; water is fed to five turbines in powerhouse by five 16 ft diam penstocks; powerhouse contains five machines operating under net head of 200 ft total rated capacity of 180,000 kW.
Maraetai power project
New Zealand Eng
James, L.S. (Autor:in)
1956
13 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
|British Library Online Contents
|Engineering Index Backfile | 1956
|Engineering Index Backfile | 1950
|Ontario's biggest power project
Engineering Index Backfile | 1951