Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Opening of Preston by-pass motorway
Lancashire North-South motorway has 8.26 mi total length, 70 mph design speed, dual carriageways 24 ft wide flanked by 1-ft marginal strips; 20,000 lb wheel load curve design; hard burned red colliery shale used for subbase upon which was laid 9-in, premixed water bound macadam; 22 bridges built over or under motorway; construction procedures. (see also Roads and Road Construction v 37 n 433 Jan 1959 p 4-9)
Opening of Preston by-pass motorway
Lancashire North-South motorway has 8.26 mi total length, 70 mph design speed, dual carriageways 24 ft wide flanked by 1-ft marginal strips; 20,000 lb wheel load curve design; hard burned red colliery shale used for subbase upon which was laid 9-in, premixed water bound macadam; 22 bridges built over or under motorway; construction procedures. (see also Roads and Road Construction v 37 n 433 Jan 1959 p 4-9)
Opening of Preston by-pass motorway
Engineer
Engineer ; 206
1958
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Opening of Preston by-pass motorway
Engineering Index Backfile | 1959
Birmingham-preston-lancaster motorway
Engineering Index Backfile | 1963
Engineering Index Backfile | 1967
Motorway construction over the Trojane Pass
Tema Archiv | 2001
|