Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pavement widening program in Iowa
During 1955 and 1956 seasons, Iowa has widened more than 1000 mi of 18 ft pavement; typical project consists of curb and flume removal, excavating and compacting trench, placing, finishing and curing new widening, and reshaping shoulders; in removing curb, 1 1/2 in. saw cut is first made at gutter line; shouldering consists mostly of blading trench material over old shoulder and compacting trench at edge.
Pavement widening program in Iowa
During 1955 and 1956 seasons, Iowa has widened more than 1000 mi of 18 ft pavement; typical project consists of curb and flume removal, excavating and compacting trench, placing, finishing and curing new widening, and reshaping shoulders; in removing curb, 1 1/2 in. saw cut is first made at gutter line; shouldering consists mostly of blading trench material over old shoulder and compacting trench at edge.
Pavement widening program in Iowa
Roads Streets
Hensing, A.N. (Autor:in) / Bloomfield, F.O. (Autor:in)
Roads and Streets ; 100
1957
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Partial-Lane Pavement Widening
NTIS | 1975
Engineering Index Backfile | 1928
|Iowa solves problem of widening narrow bridges
Engineering Index Backfile | 1956
Widening and resurfacing old pavement
Engineering Index Backfile | 1930
Mechanical behaviour of concrete pavement widening
Taylor & Francis Verlag | 2024
|