Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
75 mi street paving project in Great Falls, Mont provided that each individual street would receive only attention that it required; designing engineers had to design each block individually according to its condition; conditions ranged from broken down asphalt or concrete pavement with sagging subgrade to good concrete pavement which needed only half sole treatment; biggest problem was drainage.
75 mi street paving project in Great Falls, Mont provided that each individual street would receive only attention that it required; designing engineers had to design each block individually according to its condition; conditions ranged from broken down asphalt or concrete pavement with sagging subgrade to good concrete pavement which needed only half sole treatment; biggest problem was drainage.
Custom paving for Great Falls
Pac Bldr Engr
Nelson, P. (Autor:in)
1957
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Black Eagle Falls Dam Great Falls, Montana
ASCE | 2021
|Custom Precast Paving - Made-to-order pavers foster innovation
Online Contents | 1993
|Custom asphalt paving filler composition and a method of manufacturing the same
Europäisches Patentamt | 2016
|Great Falls Park Collection Management Plan
NTIS | 1987
|