Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Seaboard office building put up by 'lift-slab' technique
Method of pouring reinforced concrete floor, and upper floors and roof slabs at ground level, and then progressively raising them by hydraulic jacks was used for new division office building of Seaboard Air Line at Jacksonville, Fla. (See also Ry Age v 142 n 26 July 1 1957 p 36-8)
Seaboard office building put up by 'lift-slab' technique
Method of pouring reinforced concrete floor, and upper floors and roof slabs at ground level, and then progressively raising them by hydraulic jacks was used for new division office building of Seaboard Air Line at Jacksonville, Fla. (See also Ry Age v 142 n 26 July 1 1957 p 36-8)
Seaboard office building put up by 'lift-slab' technique
Ry Track Structures
1957
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Seaboard office building put up by 'lift-slab' technique
Engineering Index Backfile | 1957
Office building of 370,000 sq ft erected by lift slab method
Engineering Index Backfile | 1955
|Australia's first lift slab building
Engineering Index Backfile | 1957
Nation's tallest lift-slab building
Engineering Index Backfile | 1965
Lift slab techniques in building erection
Engineering Index Backfile | 1956
|