Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flood discharge during construction of Sergievsk hydro project
Description of performed measures during flood; during construction of dams on small rivers with large changes in water elevation, special attention should be paid to construction schedule and flood discharge for reducing peak excavation operations; ice conditions on river should be studied for long stretches along river; attention should be paid to reduction of ice flow velocity by bulldozer blades.
Flood discharge during construction of Sergievsk hydro project
Description of performed measures during flood; during construction of dams on small rivers with large changes in water elevation, special attention should be paid to construction schedule and flood discharge for reducing peak excavation operations; ice conditions on river should be studied for long stretches along river; attention should be paid to reduction of ice flow velocity by bulldozer blades.
Flood discharge during construction of Sergievsk hydro project
Propusk pavodka pri stroitel'stve Sergievskogo gidrouzla
Kocharyants, B.G. (Autor:in) / Brodin, A.G. (Autor:in)
1966
3 pages
Aufsatz (Zeitschrift)
Russisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Research and Design of Flood Discharge and Energy Dissipation Structures of Datengxia Hydro Project
DOAJ | 2022
|Construction peaks at Pergau hydro project
Online Contents | 1994
Flood discharge equipment for water conservancy project
Europäisches Patentamt | 2024
|Flood discharge equipment for water conservancy project
Europäisches Patentamt | 2023
|Water conservancy construction flood discharge equipment
Europäisches Patentamt | 2024
|