Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction aspects of waterfront facilities for Ideal Cement Company's seattle cement plant
Geological features, location and site, and waterfront design considerations of plant on deep water Duwamish Waterway inside Seattle city limits; steel sheet pile cellular bulkhead is comprised of 17 cells with connection arcs complete with cell fill, drainage, and corrosion protection; each cell is 63 ft 8 in, in diam and there is 67 ft 8 3/4 in. distance between centers of adjacent cells; 65 ft cylindrical cells penetrate 20 ft below dredge line.
Design and construction aspects of waterfront facilities for Ideal Cement Company's seattle cement plant
Geological features, location and site, and waterfront design considerations of plant on deep water Duwamish Waterway inside Seattle city limits; steel sheet pile cellular bulkhead is comprised of 17 cells with connection arcs complete with cell fill, drainage, and corrosion protection; each cell is 63 ft 8 in, in diam and there is 67 ft 8 3/4 in. distance between centers of adjacent cells; 65 ft cylindrical cells penetrate 20 ft below dredge line.
Design and construction aspects of waterfront facilities for Ideal Cement Company's seattle cement plant
ASCE Structural Eng Conference
Lochhead, G.M. (Autor:in)
ASCE Structural Engineering Conference ; 1967
1967
13 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Waterfront development for new cement plant
Engineering Index Backfile | 1968
|Seawall of novel design for Seattle Waterfront
Engineering Index Backfile | 1934
The Louisville cement company's new "brixment" plant
Engineering Index Backfile | 1923
The Oeland Cement Company's plant at Degerhamn Sweden
Engineering Index Backfile | 1924
|