Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Waterfront development for new cement plant
Waterfront bulkhead consisting of 17 steel sheet pile circular cells and connecting arcs was provided with bulkhead height of 50.5 ft for site of Ideal Cement Company's new Seattle, Wash plant; bulkhead is subject to surcharge loads of 70,000 ton windrow raw material storage adjacent to waterfront and 750 tph capacity traveling barge unloading tower crane located over cells; it also serves as dock with fender and mooring devices on water side of bulkhead.
Waterfront development for new cement plant
Waterfront bulkhead consisting of 17 steel sheet pile circular cells and connecting arcs was provided with bulkhead height of 50.5 ft for site of Ideal Cement Company's new Seattle, Wash plant; bulkhead is subject to surcharge loads of 70,000 ton windrow raw material storage adjacent to waterfront and 750 tph capacity traveling barge unloading tower crane located over cells; it also serves as dock with fender and mooring devices on water side of bulkhead.
Waterfront development for new cement plant
ASCE -- Proc (J Waterways Harbors Div)
Lochhead, G.M. (Autor:in)
1968
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1989
|Engineering Index Backfile | 1967
|Redirecting Waterfront Development
British Library Online Contents | 2007
|WATERFRONT Development -- Dubai
Online Contents | 2007
Greening Waterfront Development
British Library Online Contents | 2007
|