Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maintenance work and bank protection measures used along particularly vulnerable stretch of 36 mi long ship canal in Great Britain constructed on soft ground are described; mass concrete was deposited behind sheet piles and brought up to above water level; nylon fabric was placed over ground to act as reverse filter to prevent fine earth being washed from behind concrete blocks; blanket of 3/4 in. gravel was placed over nylon fabric, and on this gravel were laid concrete blocks of 2 ft 3 in.×1 ft 6 in.×1 ft 3 in.
Maintenance work and bank protection measures used along particularly vulnerable stretch of 36 mi long ship canal in Great Britain constructed on soft ground are described; mass concrete was deposited behind sheet piles and brought up to above water level; nylon fabric was placed over ground to act as reverse filter to prevent fine earth being washed from behind concrete blocks; blanket of 3/4 in. gravel was placed over nylon fabric, and on this gravel were laid concrete blocks of 2 ft 3 in.×1 ft 6 in.×1 ft 3 in.
Manchester's canal bank repairs
Dock and Harbor Authority
Hardie, O. (Autor:in)
1967
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2010
|Manchester's Kiss My Architecture
British Library Online Contents | 2012
Manchester's new outfall sewer
Engineering Index Backfile | 1922
Manchester's empty property initiative
British Library Online Contents | 1995
|Council Wars: Manchester's Overspill Battles
British Library Conference Proceedings | 2007
|