Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Piles 54-in. OD, caps of 27 tons and 84 ft deck sections were used in twin crossing of Lake Pontchartrain causeway; new causeway is two-lane bridge with 28-ft roadway; precast bridge deck is four-girder 84 ft span weighing 280 tons; three-pile instead of two-pile bents are being used; design includes fixed marine span with 150-ft horizontal and 50-ft vertical clearance, and double-leaf bascule with horizontal clearance of 125 ft.
Piles 54-in. OD, caps of 27 tons and 84 ft deck sections were used in twin crossing of Lake Pontchartrain causeway; new causeway is two-lane bridge with 28-ft roadway; precast bridge deck is four-girder 84 ft span weighing 280 tons; three-pile instead of two-pile bents are being used; design includes fixed marine span with 150-ft horizontal and 50-ft vertical clearance, and double-leaf bascule with horizontal clearance of 125 ft.
Proved-out methods adapted to bigger precast bridge sections
Construction Method and Equipment
Lee, R. (Autor:in)
1968
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast concrete bridge construction methods
Engineering Index Backfile | 1951
|NTIS | 1994
British Library Online Contents | 1997