Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building piers for I-5 bridge
Sheet pile and earthfill cofferdams coupled with wellpoint system are needed to keep pier work dry on major American River Bridge, key part of Interstate 5 in Sacramento, Calif; U-shaped dike was dewatered with wellpoint system consisting of five 8-in. pumps and 250 wellpoints connected to 8 in. header; in addition, four 6-in. turbine pumps in well casings were required to dewater site.
Building piers for I-5 bridge
Sheet pile and earthfill cofferdams coupled with wellpoint system are needed to keep pier work dry on major American River Bridge, key part of Interstate 5 in Sacramento, Calif; U-shaped dike was dewatered with wellpoint system consisting of five 8-in. pumps and 250 wellpoints connected to 8 in. header; in addition, four 6-in. turbine pumps in well casings were required to dewater site.
Building piers for I-5 bridge
Western Construction
Western Construction ; 42
1967
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building cofferdams for Arlington bridge piers
Engineering Index Backfile | 1928
Engineering Index Backfile | 1893
|Engineering Index Backfile | 1926
|Building bridge piers adjacent to a Masonry dam
Engineering Index Backfile | 1912
Building Liard River bridge piers under unusual difficulties
Engineering Index Backfile | 1945
|