Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Necessity for reconstruction of San Pablo Dam spillway provided East Bay Municipal Utility District with opportunity of redesigning 20-yr-old channel 1500 ft long with 155-ft drop; model studies used to check design.
Necessity for reconstruction of San Pablo Dam spillway provided East Bay Municipal Utility District with opportunity of redesigning 20-yr-old channel 1500 ft long with 155-ft drop; model studies used to check design.
Reconstructing spillway
Western Construction News
Kennedy, R.C. (Autor:in)
1942
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Spillway Modifications. San Esteban Spillway
British Library Conference Proceedings | 1992
|Spillway Gate Forces-Montgomery Point Spillway
British Library Conference Proceedings | 1995
|Experience in reconstructing the radial gate of the spillway at the Vilyui hydroelectric station
Springer Verlag | 1984
|Experience in reconstructing the radial gate of the spillway at the Vilyui hydroelectric station
Online Contents | 1984
|British Library Conference Proceedings | 1993
|