A platform for research: civil engineering, architecture and urbanism
Necessity for reconstruction of San Pablo Dam spillway provided East Bay Municipal Utility District with opportunity of redesigning 20-yr-old channel 1500 ft long with 155-ft drop; model studies used to check design.
Necessity for reconstruction of San Pablo Dam spillway provided East Bay Municipal Utility District with opportunity of redesigning 20-yr-old channel 1500 ft long with 155-ft drop; model studies used to check design.
Reconstructing spillway
Western Construction News
Kennedy, R.C. (author)
1942
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Spillway Modifications. San Esteban Spillway
British Library Conference Proceedings | 1992
|Spillway Gate Forces-Montgomery Point Spillway
British Library Conference Proceedings | 1995
|Experience in reconstructing the radial gate of the spillway at the Vilyui hydroelectric station
Springer Verlag | 1984
|Experience in reconstructing the radial gate of the spillway at the Vilyui hydroelectric station
Online Contents | 1984
|British Library Conference Proceedings | 1993
|