Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction features of new Winnipeg C.N.R. building
Built in two sections without interruption of business, 4-story, reinforced concrete structure has side wall loads carried on cantilevers and transferred to caissons in interior of building.
Construction features of new Winnipeg C.N.R. building
Built in two sections without interruption of business, 4-story, reinforced concrete structure has side wall loads carried on cantilevers and transferred to caissons in interior of building.
Construction features of new Winnipeg C.N.R. building
Eng Contract Rec
1942
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Three-hundred-mile new construction by C.N.R.
Engineering Index Backfile | 1958
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1946
New C.N.R. bridge at Fredericton
Engineering Index Backfile | 1939
Montreal terminal improvement project revived by C.N.R.
Engineering Index Backfile | 1939