A platform for research: civil engineering, architecture and urbanism
Construction features of new Winnipeg C.N.R. building
Built in two sections without interruption of business, 4-story, reinforced concrete structure has side wall loads carried on cantilevers and transferred to caissons in interior of building.
Construction features of new Winnipeg C.N.R. building
Built in two sections without interruption of business, 4-story, reinforced concrete structure has side wall loads carried on cantilevers and transferred to caissons in interior of building.
Construction features of new Winnipeg C.N.R. building
Eng Contract Rec
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Three-hundred-mile new construction by C.N.R.
Engineering Index Backfile | 1958
Engineering Index Backfile | 1928
|New C.N.R. bridge at Fredericton
Engineering Index Backfile | 1939
Engineering Index Backfile | 1946
Montreal terminal improvement project revived by C.N.R.
Engineering Index Backfile | 1939