Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building dam for Los Angeles flood control; procedures used to increase construction speed and to give well compacted embankment; long hauls were made with 13-yd rubber tired wagons traveling 20 mph; two 8-hr shifts were worked; water-filled holes were emptied by crowding water out with earthfill; fastest progress was made with borrow material below optimum moisture content; maximum density was obtained when 6-in. lifts were not exceeded even by small amount.
Building dam for Los Angeles flood control; procedures used to increase construction speed and to give well compacted embankment; long hauls were made with 13-yd rubber tired wagons traveling 20 mph; two 8-hr shifts were worked; water-filled holes were emptied by crowding water out with earthfill; fastest progress was made with borrow material below optimum moisture content; maximum density was obtained when 6-in. lifts were not exceeded even by small amount.
Rolled-fill methods at Sepulveda dam
Eng News-Rec
Morgan, J.G. (Autor:in)
Engineering News-Record ; 129
1942
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rolled earth fill forms 2,500,000-cu yd Sepulveda Dam for flood protection at Los Angeles
Engineering Index Backfile | 1942
Sepulveda Boulevard tunnel, Los Angeles
Engineering Index Backfile | 1930
|Sepulveda tunnel under mulholland highway, Los Angeles
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1942
|Lafayette rolled earth-fill dam
Engineering Index Backfile | 1928
|