Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Contracting combine tackles 10,000,000-yd rolled fill dam job that will bring flood control, power, and irrigation advantages to citizens of Western State; constructional details.
Contracting combine tackles 10,000,000-yd rolled fill dam job that will bring flood control, power, and irrigation advantages to citizens of Western State; constructional details.
Rolled-fill dam job
Excavating Engr
Spencer, F.H. (Autor:in)
Excavating Engineer ; 36
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lafayette rolled earth-fill dam
Engineering Index Backfile | 1928
|Rolled-fill methods at Sepulveda dam
Engineering Index Backfile | 1942
|The Lafayette rolled earth-fill dam
Engineering Index Backfile | 1927
Lafayette. Lafayette rolled earth-fill Dam
Engineering Index Backfile | 1928
Selecting materials for rolled-fill dams
Engineering Index Backfile | 1935
|