Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Structures at Des Arc, provided with new anchorages, cable ends, hangers, and floor system; load transfer was through cables and cable clamps, special precautions being taken to guard against stress concentrations; old and damaged ends of cables were removed and new wire ropes fastened to new and improved anchorages.
Structures at Des Arc, provided with new anchorages, cable ends, hangers, and floor system; load transfer was through cables and cable clamps, special precautions being taken to guard against stress concentrations; old and damaged ends of cables were removed and new wire ropes fastened to new and improved anchorages.
Rebuilding suspension bridge
Civ Eng (NY)
Strom, J. (Autor:in)
1942
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilding the first Budapest suspension bridge
Engineering Index Backfile | 1924
|EXISTING BRIDGE REBUILDING METHOD AND REBUILDING BRIDGE
Europäisches Patentamt | 2017
|IuD Bahn | 2011
|Rebuilding CSXT's Ninemile Bridge
Online Contents | 1997