A platform for research: civil engineering, architecture and urbanism
Structures at Des Arc, provided with new anchorages, cable ends, hangers, and floor system; load transfer was through cables and cable clamps, special precautions being taken to guard against stress concentrations; old and damaged ends of cables were removed and new wire ropes fastened to new and improved anchorages.
Structures at Des Arc, provided with new anchorages, cable ends, hangers, and floor system; load transfer was through cables and cable clamps, special precautions being taken to guard against stress concentrations; old and damaged ends of cables were removed and new wire ropes fastened to new and improved anchorages.
Rebuilding suspension bridge
Civ Eng (NY)
Strom, J. (author)
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilding the first Budapest suspension bridge
Engineering Index Backfile | 1924
|IuD Bahn | 2011
|Rebuilding CSXT's Ninemile Bridge
Online Contents | 1997