Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunneling through Garlock fault
Two shields were used in driving 5 mi long water supply tunnel through Tehachapi Mountains in Southern California; laser beam was used for tunnel alignment; 24-ft 4 in. diam steel shields are forced forward with ring of hydraulic jacks mounted at their rear ends; each one has thrust of 250 tons, for total of 11,500,000 lb.
Tunneling through Garlock fault
Two shields were used in driving 5 mi long water supply tunnel through Tehachapi Mountains in Southern California; laser beam was used for tunnel alignment; 24-ft 4 in. diam steel shields are forced forward with ring of hydraulic jacks mounted at their rear ends; each one has thrust of 250 tons, for total of 11,500,000 lb.
Tunneling through Garlock fault
Western Construction
Western Construction ; 42
1967
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Adam Garlock. April 26, 1848. Laid upon the table
TIBKAT | 1848
|Tunneling Through a Fault Zone at West Trunk
British Library Conference Proceedings | 2017
|Tunneling through the Hollywood Fault Zone for the Los Angeles Metro
British Library Conference Proceedings | 1995
|Engineering Index Backfile | 1946
Tunneling in fault zones, Tuzla tunnel, Turkey
Online Contents | 2003
|