Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Coastal embankment project for east Pakistan
will require construction of approximately 920 drainage sluices and placement of approximately 350,000,000 cu yd of earth; all earth is placed by head baskets, and sluices are constructed by local methods with minimum use of mechanical equipment; by using capabilities of local manufacturers, project is progressing on schedule, with minimum expenditure of scarce foreign exchange.
Coastal embankment project for east Pakistan
will require construction of approximately 920 drainage sluices and placement of approximately 350,000,000 cu yd of earth; all earth is placed by head baskets, and sluices are constructed by local methods with minimum use of mechanical equipment; by using capabilities of local manufacturers, project is progressing on schedule, with minimum expenditure of scarce foreign exchange.
Coastal embankment project for east Pakistan
ASCE -- Proc (J Waterways Harbors Div)
Haq, S. (Autor:in) / Burns, J.I. (Autor:in)
1975
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Coastal dikes and embankment seawalls
HENRY – Bundesanstalt für Wasserbau (BAW) | 2007
|Outline of Ganges-Brahmaputra multipurpose project in East Pakistan
Engineering Index Backfile | 1957
|Coastal composite tough embankment structure and construction method
Europäisches Patentamt | 2023
|DEVELOPMENT OF THE COASTAL EMBANKMENT SYSTEM IN BANGLADESH
British Library Conference Proceedings | 2003
|