Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Extension of Steenbras Waterworks to augment Capetown's water supply
Completion of raising of main dam wall; steel pipe line, 33 miles long, to be run to Newlands reservoir.
Extension of Steenbras Waterworks to augment Capetown's water supply
Completion of raising of main dam wall; steel pipe line, 33 miles long, to be run to Newlands reservoir.
Extension of Steenbras Waterworks to augment Capetown's water supply
S. African Eng
1927
2 pages
1 Fig.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Paris water supply as example of modern waterworks extension
Engineering Index Backfile | 1929
|Extension of the Magdeburg waterworks
Engineering Index Backfile | 1915
|The Chicago waterworks extension tunnels
Engineering Index Backfile | 1898
Kobe municipal waterworks extension program
Engineering Index Backfile | 1930
|Earth dam to augment Athens water supply
Tema Archiv | 1977
|