A platform for research: civil engineering, architecture and urbanism
Extension of Steenbras Waterworks to augment Capetown's water supply
Completion of raising of main dam wall; steel pipe line, 33 miles long, to be run to Newlands reservoir.
Extension of Steenbras Waterworks to augment Capetown's water supply
Completion of raising of main dam wall; steel pipe line, 33 miles long, to be run to Newlands reservoir.
Extension of Steenbras Waterworks to augment Capetown's water supply
S. African Eng
1927
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paris water supply as example of modern waterworks extension
Engineering Index Backfile | 1929
|Extension of the Magdeburg waterworks
Engineering Index Backfile | 1915
|The Chicago waterworks extension tunnels
Engineering Index Backfile | 1898
Kobe municipal waterworks extension program
Engineering Index Backfile | 1930
|Earth dam to augment Athens water supply
Tema Archive | 1977
|