Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Negley run relief sewer
Construction of 3548 ft. of 72-and 78-in. brick and concrete sewers in open trench and tunnel, with trench excavation backfilled by traveling overhead machine.
Negley run relief sewer
Construction of 3548 ft. of 72-and 78-in. brick and concrete sewers in open trench and tunnel, with trench excavation backfilled by traveling overhead machine.
Negley run relief sewer
Public Works
Public Works ; 53
1922
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1914
British Library Conference Proceedings | 2010
|Flatbush, Brooklyn, relief sewer
Engineering Index Backfile | 1926