Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Burlington bridge, near Hamilton, involved difficult foundation problems
Strauss bascule span replaces swing structure. Presence of sand for depth of 100 ft. made extensive piling necessary. Sheet steel cofferdam enclosed pier sites. Continuous pumping to keep water down.
Burlington bridge, near Hamilton, involved difficult foundation problems
Strauss bascule span replaces swing structure. Presence of sand for depth of 100 ft. made extensive piling necessary. Sheet steel cofferdam enclosed pier sites. Continuous pumping to keep water down.
Burlington bridge, near Hamilton, involved difficult foundation problems
Contract Rec
Paulin, F.W. (Autor:in)
Contract Record ; 36
1922
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Case Study of Burlington Cable-Stayed Bridge
British Library Online Contents | 1994
|Difficult foundation problems connected with soil stabilization
Engineering Index Backfile | 1966
|Case Study of Burlington Cable-Stayed Bridge
Online Contents | 1994
|The new Burlington bridge at Kansas City
Engineering Index Backfile | 1917