Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of horizontal well for groundwater supply of Suederelbmarsch, Germany
Well is 22 m deep with concrete shaft wall of at least 40 cm.
Construction of horizontal well for groundwater supply of Suederelbmarsch, Germany
Well is 22 m deep with concrete shaft wall of at least 40 cm.
Construction of horizontal well for groundwater supply of Suederelbmarsch, Germany
Bau eines Schachtbrunnens
Mueller, E. (Autor:in)
Bautechnik ; 30
1953
5 pages
Illustrations
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Aquifer response to a horizontal groundwater extraction well
British Library Conference Proceedings | 2001
|Hydraulic performance of a horizontal groundwater extraction well
British Library Conference Proceedings | 2000
|Shallow groundwater combined well structure and well completion construction method thereof
Europäisches Patentamt | 2020
|Construction method of horizontal well structure of refuse landfill
Europäisches Patentamt | 2023
|