Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Outline of work done during construction; solution lay in building two parallel concrete walls from ground level to three or four ft below bottom of subway structure; ground between was excavated and subway built in clear; method proved practical and has economical advantages.
Outline of work done during construction; solution lay in building two parallel concrete walls from ground level to three or four ft below bottom of subway structure; ground between was excavated and subway built in clear; method proved practical and has economical advantages.
Underpinning on Toronto subway
Eng J
Scrivener, R.H. (Autor:in)
Engineering Journal ; 36
1953
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Underpinning near deep subway excavation
Engineering Index Backfile | 1914
Engineering Index Backfile | 1965
Engineering Index Backfile | 1962
British Library Conference Proceedings | 2005
|Engineering Index Backfile | 1950
|