Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel pile wharf construction at Darwin
Reconstruction of Fort Hill Wharf at Darwin, Australia, described; tubular steel piles were driven in place of timber; superstructure timbers were renewed; wharf proper will be 140 ft wide by 503 ft long; both wharf and approach are founded on 18 in. diam steel tubular piles; heavy coating of bitumen emulsion is applied to piles above low water level as protection against corrosion.
Steel pile wharf construction at Darwin
Reconstruction of Fort Hill Wharf at Darwin, Australia, described; tubular steel piles were driven in place of timber; superstructure timbers were renewed; wharf proper will be 140 ft wide by 503 ft long; both wharf and approach are founded on 18 in. diam steel tubular piles; heavy coating of bitumen emulsion is applied to piles above low water level as protection against corrosion.
Steel pile wharf construction at Darwin
Commonwealth Engr
O'Meara, A.T. (Autor:in)
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.