Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Techniques employed in current construction of Bloor-Danforth Univ subway extension structures in Toronto; use of cut-and-cover, and Milan methods and special shields in construction; shield consists of steel cylinder extending from cutting edge at leading end to tail overlapping tunnel lining at trailing edge.
Techniques employed in current construction of Bloor-Danforth Univ subway extension structures in Toronto; use of cut-and-cover, and Milan methods and special shields in construction; shield consists of steel cylinder extending from cutting edge at leading end to tail overlapping tunnel lining at trailing edge.
Subway construction in Toronto
Civ Eng (NY)
Spiegelman, J. (Autor:in)
1962
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|British Library Conference Proceedings | 2005
|Engineering Index Backfile | 1965
Engineering Index Backfile | 1962
Engineering Index Backfile | 1953