Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sluicing pumps wash fines out of fill [midline ellipsis] create impervious core in earthfill dam
Earthfill dam 150-ft high on hydroelectric power project on Shipshaw River in northern Quebec required 1,300,000 cu yd of material; 6-in. sluicing pumps washed fines into center of growing dam to create impervious core.
Sluicing pumps wash fines out of fill [midline ellipsis] create impervious core in earthfill dam
Earthfill dam 150-ft high on hydroelectric power project on Shipshaw River in northern Quebec required 1,300,000 cu yd of material; 6-in. sluicing pumps washed fines into center of growing dam to create impervious core.
Sluicing pumps wash fines out of fill [midline ellipsis] create impervious core in earthfill dam
Construction Methods Equipment
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Impervious core compaction using heavy vibrating rollers (earthfill dam)
Tema Archiv | 1979
|Weather [midline ellipsis] waves [midline ellipsis] and offshore oil
Engineering Index Backfile | 1957
|Roadbuilding [midline ellipsis] 1939 accomplishments [midline ellipsis] 1940 budgets and outlook
Engineering Index Backfile | 1940
Construction of consolidated fill [midline ellipsis] lifts slow order over swamp
Engineering Index Backfile | 1954
[midline ellipsis] for duration
Engineering Index Backfile | 1942