Precasting pays off on long concrete trestle
Bridge proper carrying two 12-ft traffic lanes in each direction with 3-ft median strip and 3-ft sidewalk on each side, is 10,198 ft long; approaches consist of 137 and 104 reinforced concrete spans, each 41 ft long; bascule span and its steel side spans total 317 ft in length; precast elements were transported by barge to site. (See also Construction Methods and Equipment v 35 n 1 Jan 1953 p 54-60)
Precasting pays off on long concrete trestle
Bridge proper carrying two 12-ft traffic lanes in each direction with 3-ft median strip and 3-ft sidewalk on each side, is 10,198 ft long; approaches consist of 137 and 104 reinforced concrete spans, each 41 ft long; bascule span and its steel side spans total 317 ft in length; precast elements were transported by barge to site. (See also Construction Methods and Equipment v 35 n 1 Jan 1953 p 54-60)
Precasting pays off on long concrete trestle
Civ Eng (NY)
Wood, R.H. (Autor:in)
1953
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Precasting pays off on long concrete trestle
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1941
Precasting Concrete just in Time
Online Contents | 1994
|Precasting concrete window frames
Engineering Index Backfile | 1951
British Library Conference Proceedings | 1993
|