Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
To make Cape Breton Island's coal more accessible, mile wide Strait of Canso on Canada's east coast is bridged by causeway; 50-ft tunnel 4×3 ft had to be driven into face of Porcupine mountain; small coyote blast required 3000 lb of dynamite; larger blasts required 16, 000 lb; primacord is used as detonator.
To make Cape Breton Island's coal more accessible, mile wide Strait of Canso on Canada's east coast is bridged by causeway; 50-ft tunnel 4×3 ft had to be driven into face of Porcupine mountain; small coyote blast required 3000 lb of dynamite; larger blasts required 16, 000 lb; primacord is used as detonator.
Rob mountain to build Canso causeway
Excavating Engr
Pelrine, D. (Autor:in)
Excavating Engineer ; 48
1954
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Possibility of building causeway across strait of canso
Engineering Index Backfile | 1949
9,000,000 tons of rock fill required for Strait of Canso causeway
Engineering Index Backfile | 1952
Monitoring and Investigation of Canso Canal Southern Gates
British Library Conference Proceedings | 2008
|Engineering Index Backfile | 1945
Constructing modern highway across Strait of Canso
Engineering Index Backfile | 1953
|