Design of Eklutna Project, Alaska
Second unit "went on line" on Apr 1 1955; annual firm energy provided by plant is estimated to total 140 million kw-hr; transmission lines, operating at 115 kv and totaling 41 mi length.
Design of Eklutna Project, Alaska
Second unit "went on line" on Apr 1 1955; annual firm energy provided by plant is estimated to total 140 million kw-hr; transmission lines, operating at 115 kv and totaling 41 mi length.
Design of Eklutna Project, Alaska
Am Soc Civ Engrs -- Proc (J Power Div)
Cook, F.B. (Autor:in) / Goodman, D.L. (Autor:in)
1955
26 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Effect of earthquake of March 27, 1964, on Eklutna Hydroelectric Project, Anchorage, Alaska
Engineering Index Backfile | 1967
|Eklutna Dam tunnel and powerplant
Engineering Index Backfile | 1958
Homer By-Pass, Project F-021-1(14), Homer Alaska
NTIS | 1971