Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Recent improvements include refooting of two quays to achieve draft of 9 m for 360 m of quays, construction of new elevator bridge of 16.5 m span over La Peyrade canal, building of refrigerated warehouses with 660 cu m total capacity, and construction of 2500 m long pipe line to service oil tankers.
Recent improvements include refooting of two quays to achieve draft of 9 m for 360 m of quays, construction of new elevator bridge of 16.5 m span over La Peyrade canal, building of refrigerated warehouses with 660 cu m total capacity, and construction of 2500 m long pipe line to service oil tankers.
Port of Sete
Le port de Sete
Lassalvy, J. (Autor:in)
1964
12 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Baraquette sous influence: Sete
British Library Online Contents | 2007
SeTe alloy semiconductor core optical fibers
British Library Online Contents | 2018
|Reescrever o pós-moderno : sete entrevistas
TIBKAT | 2011
|