A platform for research: civil engineering, architecture and urbanism
Recent improvements include refooting of two quays to achieve draft of 9 m for 360 m of quays, construction of new elevator bridge of 16.5 m span over La Peyrade canal, building of refrigerated warehouses with 660 cu m total capacity, and construction of 2500 m long pipe line to service oil tankers.
Recent improvements include refooting of two quays to achieve draft of 9 m for 360 m of quays, construction of new elevator bridge of 16.5 m span over La Peyrade canal, building of refrigerated warehouses with 660 cu m total capacity, and construction of 2500 m long pipe line to service oil tankers.
Port of Sete
Le port de Sete
Lassalvy, J. (author)
1964
12 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Baraquette sous influence: Sete
British Library Online Contents | 2007
SeTe alloy semiconductor core optical fibers
British Library Online Contents | 2018
|Reescrever o pós-moderno : sete entrevistas
TIBKAT | 2011
|