Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
For faster freight handling
New depot constructed by Atlantic Coast Line at Florence, SC, adjacent to transfer sheds; structure consists of single story office building at one end and 40 ft by 300 ft warehouse; walls of warehouse are of reinforced concrete to height of 5 ft, with corrugated asbestos siding above.
For faster freight handling
New depot constructed by Atlantic Coast Line at Florence, SC, adjacent to transfer sheds; structure consists of single story office building at one end and 40 ft by 300 ft warehouse; walls of warehouse are of reinforced concrete to height of 5 ft, with corrugated asbestos siding above.
For faster freight handling
Ry Age
Railway Age ; 139
1955
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fire protection in freight handling
Engineering Index Backfile | 1927
|Acceleration of freight handling at terminals
Engineering Index Backfile | 1920
|The location and arrangement of freight houses and the handling of house freight
Engineering Index Backfile | 1909
|Facilities for handling freight at New York railroad terminals
Engineering Index Backfile | 1875
|