A platform for research: civil engineering, architecture and urbanism
For faster freight handling
New depot constructed by Atlantic Coast Line at Florence, SC, adjacent to transfer sheds; structure consists of single story office building at one end and 40 ft by 300 ft warehouse; walls of warehouse are of reinforced concrete to height of 5 ft, with corrugated asbestos siding above.
For faster freight handling
New depot constructed by Atlantic Coast Line at Florence, SC, adjacent to transfer sheds; structure consists of single story office building at one end and 40 ft by 300 ft warehouse; walls of warehouse are of reinforced concrete to height of 5 ft, with corrugated asbestos siding above.
For faster freight handling
Ry Age
Railway Age ; 139
1955
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fire protection in freight handling
Engineering Index Backfile | 1927
|Acceleration of freight handling at terminals
Engineering Index Backfile | 1920
|The location and arrangement of freight houses and the handling of house freight
Engineering Index Backfile | 1909
|English facilities for handling freight -- Hydraulic cranes and capstans
Engineering Index Backfile | 1896