Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Floating rigs, high-strength bolts cut girder bridge erection time
Erection of great Egg Bay bridge in New Jersey which involves 2730 ft of structural steel work and is part of 165-mi parkway; sections were set by derrick boat having 75 ton capacity stiff-leg derrick with 43 ft mast and 90 ft boom.
Floating rigs, high-strength bolts cut girder bridge erection time
Erection of great Egg Bay bridge in New Jersey which involves 2730 ft of structural steel work and is part of 165-mi parkway; sections were set by derrick boat having 75 ton capacity stiff-leg derrick with 43 ft mast and 90 ft boom.
Floating rigs, high-strength bolts cut girder bridge erection time
Roads Streets
Roads and Streets ; 99
1956
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
Europäisches Patentamt | 2024
|Bridge girder erection machine and bridging method of bridge girder erection machine
Europäisches Patentamt | 2020
|Rotary support applied to curved girder erection bridge girder erection machine
Europäisches Patentamt | 2022
|